Image 0
STOCK IMAGE

Auction Ended

https://m.media-amazon.com/images/I/71W+00drx9L.jpg
https://s3.amazonaws.com/lotting-images-prod/webster/WBS3809880_1769631040293.jpeg
https://m.media-amazon.com/images/I/81BRzHoMeCL.jpg
https://m.media-amazon.com/images/I/81pBfnK12cL.jpg
https://m.media-amazon.com/images/I/81cIY3oVIuL.jpg

LUTER Meat Temperature Guide, Cooking Temperatures Magnet Meat Smoking Guide Sign Meat Grilling Guide Magnet Meat Temperature Chart BBQ Smoker Accessories (Meat Type, Time, Temperature, Wood Type)

Sold
New/Like New
QTY 1
$0.80
MSRP

MSRP is a sample online retail price.

$7.59

Last Update:

02/03/2026, 1:21 AM EST

Item Information

MSRP:

MSRP is a sample online retail price.

$7.59
Brand:
LUTER
Condition:
New/Like New
Description:
Specification: Color: as shown in the picture Material: soft magnetism The length of ankle strap: 9.8x6.7inch/25x17cm Package details: 1 x meat smoking guide Note: Due to manual measurement, the size and weight may have a certain error. Due to the difference between monitors, there may be a slight color difference.
Unit Quantity Description:
1 QTY = 1
Model:
75472
Lot Code:
WBS3809880
Width:
6.7 inches
Depth:
0.9 inches
Weight:
0.1 pounds
Length:
9.9 inches
Additional Info:
New/Like New
Pickup Location:
1825 Webster Street, Dayton OH 45414
Warehouse Location:
G7
Auction Number
WBS2600387

Related Auctions

From ($)To ($)Increment ($)