Image 0
STOCK IMAGE

0 days 10:47:37

https://m.media-amazon.com/images/I/61frIH6dAVL.jpg
https://s3.amazonaws.com/lotting-images-prod/webster/WBS7503214_1766796198597.jpeg

HORZE Nest 10' Combination Polo Wraps (Set of Four) | Fleece and Elastic Horse Bandages

New/Like New
QTY 1
$8.20
MSRP

MSRP is a sample online retail price.

$32.99

Last Update:

02/06/2026, 5:34 AM EST

Item Information

MSRP:

MSRP is a sample online retail price.

$32.99
Brand:
HORZE
Condition:
New/Like New
Description:
These bandages feature a fleece lining and flexible support to keep your wrap in place. These bandages are perfect for training and come in fashion colors. Wide hook-and-loop fasteners keep them securely in place during dressage lessons or a jumping clinic. The elastic outer makes adjusting these soft bandages easy and allows you to provide your horse with the proper support and protection he needs during any sport. Material: Polar fleece and ribbed acrylic fabric w/stretch. Length: 9 ft. 10 in (3 m). 4" wide.
Model:
18030-EDB
Lot Code:
WBS7503214
Width:
7.9 inches
Depth:
3.3 inches
Weight:
1.2 pounds
Length:
10.0 inches
Additional Info:
New/Like New
Pickup Location:
1825 Webster Street, Dayton OH 45414
Auction Number
WBS2505043

Related Auctions

From ($)To ($)Increment ($)
Your Bid

Your bid for this item is $NaN!

Pickup location:

Are you sure?

Warning