Image 0
STOCK IMAGE

Auction Ended

https://m.media-amazon.com/images/I/81H1KcTjxSL.jpg
https://s3.amazonaws.com/lotting-images-prod/webster/WBS3176450_1761054168613.jpeg
https://m.media-amazon.com/images/I/81zcxKi+hgL.jpg
https://m.media-amazon.com/images/I/81wCzVn0RGL.jpg
https://m.media-amazon.com/images/I/81LTA7aO2hL.jpg

Amazon Basics Ceramic Space Heater, Portable Heater for Indoor Use, for Office and Home, With Overheat and Tip-Over Protection, Thermostat, Non-Oscillating, 1500W, Black, 7.52"D x 6.34"W x 9.45"H

Sold
Good Condition
QTY 1
$8.00
MSRP

MSRP is a sample online retail price.

$22.49

Last Update:

10/27/2025, 2:33 AM EST

Item Information

MSRP:

MSRP is a sample online retail price.

$22.49
Brand:
Amazon Basics
Condition:
Good Condition
Description:
Amazon Basics 1500W Ceramic Personal Heater with Adjustable Thermostat, Black From the Manufacturer Amazon Basics
Lot Code:
WBS3176450
Width:
8.2 inches
Depth:
7.0 inches
Weight:
3.5 pounds
Length:
10.9 inches
Additional Info:
Good Condition
Pickup Location:
1825 Webster Street, Dayton OH 45414
Warehouse Location:
F01
Auction Number
WBS2504071

Related Auctions

From ($)To ($)Increment ($)