Auction Ended
Over The Door Metal Hooks with Plastic Coating 5.5" Fit 0.5" to 1 3/4" Door 4 Pcs Heavy Duty Single Towel Robe Rack Wreath Bathroom Shower Hanger Shoe Organizer Ironing Board Short White
Sold
Brand New
QTY 1
$1.15
MSRP
MSRP is a sample online retail price.
$5.99
Last Update:
07/05/2025, 5:15 PM ESTItem Information
MSRP:
MSRP is a sample online retail price.
$5.99
Brand:
Mars-Rock
Condition:
Brand New
Description:
N/A
Model:
55KW4
Lot Code:
WBS3250109
Width:
5.2 inches
Depth:
0.6 inches
Weight:
0.5 pounds
Length:
8.2 inches
Additional Info:
Brand New
Pickup Location:
1825 Webster Street, Dayton OH 45414
Warehouse Location:
I1
Auction Number
WBS2502411