Auction Ended
(Renewed) 2021 Apple 12.9-inch iPad Pro (Wi?Fi, 256GB) - Space Gray
Sold
Working Condition Verified
QTY 1
$360.00
MSRP
MSRP is a sample online retail price.
$1,199.00
Last Update:
12/18/2025, 12:43 PM ESTItem Information
MSRP:
MSRP is a sample online retail price.
$1199.00
Brand:
Apple
Condition:
Working Condition Verified
Description:
see all the picture
Model:
MHNH3LL/A
Lot Code:
WBS3220261
Width:
10.3 inches
Depth:
3.2 inches
Weight:
4.1 pounds
Length:
13.0 inches
Additional Info:
Working Condition Verified
Pickup Location:
1825 Webster Street, Dayton OH 45414
Warehouse Location:
White Table
Auction Number
WBS2501211



































































