Auction Ended
Calendar 2024-2025, 18 Months Wall Calendar July 2024 to Dec 2025 Calendar with Julian Dates, 11" X 8.5" (Water Ink)
Sold
Brand New
QTY 1
$0.05
MSRP
MSRP is a sample online retail price.
$6.29
Last Update:
07/18/2025, 3:53 AM ESTItem Information
MSRP:
MSRP is a sample online retail price.
$6.29
Brand:
XISIDO
Condition:
Brand New
Description:
N/A
Lot Code:
WBS3102575
Width:
8.7 inches
Depth:
0.2 inches
Weight:
0.4 pounds
Length:
11.1 inches
Additional Info:
Brand New
Pickup Location:
1825 Webster Street, Dayton OH 45414
Warehouse Location:
D06
Auction Number
WBS2500180