Auction Ended
Cat6 Plenum Shielded (CMP) Overall Foil Shield (F/UTP), 1000ft, 23AWG | 100% Solid Bare Copper | 550MHz | Bulk Ethernet Cable, Available in Blue, White & Black Color
Sold
Good Condition
QTY 1
$80.00
MSRP
MSRP is a sample online retail price.
$272.95
Last Update:
12/12/2025, 2:30 PM ESTItem Information
MSRP:
MSRP is a sample online retail price.
$272.95
Brand:
BNCables
Condition:
Good Condition
Description:
Turnstone Cables Cat6 plenum Cable Pure Copper Shielded Ethernet 1000ft Cable. Cat6 Plenum cable is used in buildings and plenum spaces for easy and smooth installation. Supports up-to 550 MHz bandwidth speed, 4 pairs with spline put together to form a core and rip cord full length of cable to make it easy to tear the cable. 23 AWG Bare Copper conductor insulated with HDPE to stop extreme attacks. Its core is jacketed is low smoke, fire retardant. Available in Blue, Black and white color.
Lot Code:
RED5704214
Width:
14.5 inches
Depth:
13.0 inches
Weight:
43.0 pounds
Length:
14.5 inches
Additional Info:
Good Condition
Pickup Location:
1260 Ohio Pike, Amelia OH 45102
Auction Number
AML2400394







































































