Auction Ended
Coleman Cold Weather Rectangular Sleeping Bag, Brazos Cold 33in. x 75in. Blue
Sold
Good Condition
QTY 1
$9.07
MSRP
MSRP is a sample online retail price.
$35.15
Last Update:
12/12/2025, 10:08 PM ESTItem Information
MSRP:
MSRP is a sample online retail price.
$35.15
Brand:
Coleman
Condition:
Good Condition
Description:
Sleep comfortably, even when it's 20 degrees F outside in the Coleman Brazos Cold Weather Sleeping Bag. The specially-designed, patented zipper system plows through the fabric to avoid snags, even around the bottom corner. The Thermolock System reduces heat loss though the zipper, and Fiberlock Construction prevents insulation from shifting-extending the life of your sleeping bag. When you're ready to pack up, the patented Roll Control System keeps the bag in place for easier rolling and the stuff sack mak...
Model:
0007650104863
Lot Code:
BLU5257193
Additional Info:
Good Condition
Pickup Location:
41855 North Ridge Road, Elyria OH 44035
Auction Number
ELR2400114






























































